Ripa Concrete Cutting completed concrete cutting, core drilling and demolition works for CPB Dragados Samsung Joint Venture as part of the The WestConnex NewM5 from May 2016 to March 2020.
PROJECT HIGHLIGHTS
Assisting with the demolition of Kingsgrove Tunnel by using the Brokk 400 demolition robot
Completing concrete cutting works both above and underground (tunnel works)
Wall Sawing over 200m and drilling lifting holes to aid in the removal of concrete panels from Kingsgrove with excavators